The first question in a cutter suction dredger enquiry is rarely about features. It is about volume: how many cubic metres you must move, how deep the material sits and how far it must travel. A 6/24 cutter suction dredger decision is really a question of matching pump diameter to that number before you look at engines or cabins.
We are ITECH Co.,Ltd., and we scale CSD size to project volume, then work backwards to pipe and power. Below we set out how pump size maps to capacity, where a 6 to 10 inch unit is the right answer, what changes in the 14 to 18 inch band, and when a 20 to 24 inch machine earns its keep.
A CSD has a ladder, a cutter head at the end of it, a pump, a discharge pipeline and a spud or anchor system. The ladder sets the cutting depth. The pump and pipe set what leaves the site. The engine and winches set how fast the ladder can advance.
The head rotates and breaks the bed; the pump draws slurry up the suction line and pushes it along the discharge line to the placement area. Capacity follows the pump and pipe, not the size of the hull. See the cutter suction dredger range for the builds we list.
Oversizing costs as much as undersizing. A machine with twice the capacity you need still carries the fuel bill and the crew, and it spends much of the shift waiting for material. We scale the dredger to the volume first.
CSDs cut compacted soil, clay and rock. That is the reason to pick one over a plain suction unit: the head does the loosening, so the pump receives feed at a controlled rate instead of chasing the bed.
Our CSDs are dismountable and road transportable. That matters when a project moves between sites or the only access is a narrow route. A machine that travels in parts starts earning sooner than one that needs a barge.
Fuel-efficient operation and low maintenance are design aims across the range. The saving comes from matching power to duty; a correctly sized unit does not burn fuel pushing air through an empty pipe.
The table below uses only the series figures we publish. Single inch-size pages list variants but not full specifications; those stay to be confirmed in writing.
In our series, 200 mm pipe pairs with 500 m3/hr and 300 mm with 1200 m3/hr. At the top, 750/700 mm pairs with 7000 m3/hr. Pipe diameter and capacity move together, so start selection with the volume you must shift.
Depth rises from 1-5 m on the CSD-200 to 1.5-20 m on the CSD-700. Check the deepest cut in your plan, then add a margin for the ladder and for bed settlement. A machine that just reaches the target depth will struggle.
Engine power runs from 160-300 kW on the CSD-200 to 2800-3500 kW on the CSD-700. Power buys cutting force and pipeline reach, not just speed. Match it to material strength and discharge distance together.
Standard and custom-built CSDs are both available. Exact specification of any single inch-size page beyond the series table is to be confirmed in writing, so ask for a data sheet before you compare tenders.
CSD series capacity, depth, pipe and power published by ITECH | ||||
Model | Capacity | Dredging depth | Suction/discharge pipe | Engine power |
|---|---|---|---|---|
CSD-200 | 500 m3/hr | 1-5 m | 200/200 mm | 160-300 kW |
CSD-250 | 800 m3/hr | 1-8 m | 250/250 mm | 200-400 kW |
CSD-300 | 1200 m3/hr | 1-12 m | 300/300 mm | 400-600 kW |
CSD-400 | 2200 m3/hr | 1.5-14 m | 400/400 mm | 700-1200 kW |
CSD-500 | 3500 m3/hr | 1.5-15 m | 600/500 mm | 1100-1600 kW |
CSD-650 | 5000 m3/hr | 1.5-18 m | 650/650 mm | 2200-2500 kW |
CSD-700 | 7000 m3/hr | 1.5-20 m | 750/700 mm | 2800-3500 kW |
A 10 inch cutter suction dredger sits in the band where a small crew can still run the job. It suits ponds, narrow canals and capital work on a limited budget. Lower power means shorter discharge runs, so check the placement distance.
A 24 inch cutter suction dredger belongs on high-volume capital works and land reclamation, where the pipeline runs a long way and the machine must keep feeding it. These units need space, a trained crew and a planned spares store.
Not every site fits a standard ladder or power pack. We adapt the build to your depth, pipe and transport constraints. Agree the changes in a drawing pack; do not assume a variant on an inch-size page carries the series figures.
New channels and harbour basins need steady volume over weeks. That is where the mid and upper series models pay for themselves; the cost per cubic metre falls as the machine keeps cutting.
Maintenance jobs are shorter and move between berths. A smaller CSD that can be moved quickly often beats a large unit that spends a day in transit between two short assignments.
Reclamation needs continuous placement over long discharge lines. Capacity and pipe diameter matter more than digging depth here, so choose from the upper half of the series.
Hard material needs cutter force and a ladder that holds the head in the cut. Pair the deeper models with the right cutter teeth; the pump cannot compensate for a head that will not bite.
Cutter suction dredger versus jet suction dredging | ||
Dimension | Cutter suction dredger | Jet suction dredging |
|---|---|---|
Material | Compacted soil, clay and rock | Sand and loose sediment |
Tool | Cutter head with teeth | High-pressure water jet |
Depth range | Published series covers 1-20 m | Works in greater depths under overburden |
Output | Higher volume in hard material | Strong in deep sand extraction |
Mobility | Dismountable and road transportable | Often portable or trailer mounted |
Best fit | Capital works and land reclamation | Deep sand beneath a clay cap |
Total cubic metres and the number of working days set the required hourly rate. Add a margin for weather and for material that does not flow as expected. Then look at model numbers.
Our series ties 200 mm to 500 m3/hr and 300 mm to 1200 m3/hr. Use that as a first filter, then adjust for discharge distance. A long line erodes the capacity you thought you had.
Dredging depth in the series runs from 1-5 m up to 1.5-20 m. Compare it with the deepest cut and with the water level at its lowest. A 6/24 cutter suction dredger chosen at high water can fail at low water.
An 18 inch cutter suction dredger suits contracts that need more reach than a small unit but cannot justify the largest frames. It is a common compromise for port works with moderate volume and mixed material.
Higher kW buys cutting force but also a larger transport job. Our CSDs are dismountable and road transportable, yet a CSD-700 is not a machine you move on a whim. Cost the moves before you sign.
The ladder and spud system carry the cutting load. Check the deck and the towing frame for the weight of the chosen model, and confirm the ground bearing if the unit works from a bank.
Spuds and anchors hold the vessel against the cutter force. On a strong tide you may need both; on a sheltered pond a single anchor set is enough. Decide this with the ladder specification.
Confirm placement distance, water level range and the disposal route. A dredger sized for volume is useless if the slurry has nowhere to go. Plan the pipeline with the machine, not after it.
Ask for a data sheet with capacity, depth, pipe diameter and engine power on one line. Anything beyond the published series table is to be confirmed in writing.
If your site needs a different ladder length or power pack, send the constraint in writing. We will confirm which changes fit the standard frame and which need a custom build.
Where material is uncertain, send a sample. It tells us whether cutter teeth or liner wear will dominate the maintenance budget, and it helps us set a realistic hourly rate.
Our online service team replies within eight hours. Ask for the wear-part list with the quotation so the dredger arrives with a spares plan, not just a manual.
We have built dredging equipment since 1994, with more than thirty years in the field. Our ISO 9001 certified facilities use robotic welding, and our in-house group works on cutter hydraulics and wear parts. We have shipped to many countries; the exact count is to be confirmed in writing.
We publish the full CSD series table so you can compare capacity, depth, pipe and power before you call us. When a project sits between two models, we say so and explain which assumption drives the choice. That gives you a specification you can take to a tender.
In our published series, 200 mm suction and discharge pipe pairs with 500 m3/hr, 300 mm with 1200 m3/hr and 750/700 mm with 7000 m3/hr. Use the relationship as a first filter, then adjust for discharge distance and material density. The pipe sets what the dredger can actually deliver.
It depends on volume and depth, not on the label. A 6 inch unit suits small ponds, narrow channels and short discharge runs. If you need several thousand cubic metres a day or a cut deeper than the small frames allow, move up the series. Send the numbers and we will confirm in writing.
It spans small 6 inch units through the published CSD series up to the 24 inch class and beyond. The series table lists seven models from 500 to 7000 m3/hr with depths from 1-5 m to 1.5-20 m. Exact figures for a single inch-size page are to be confirmed in writing.
Compare hourly volume, maximum depth and discharge distance. A mid-size unit is cheaper to move and run; a large unit wins when the pipeline is long and the work is continuous. We cost both against your schedule before recommending one.
Yes, our CSDs are stated to dredge compacted soil, clay and rock. The cutter head and teeth do the breaking; the pump only moves what has been loosened. Match the tooth type to the material and expect a shorter inspection interval in abrasive rock.