Views: 0 Author: Site Editor Publish Time: 2026-11-19 Origin: Site
You have a spec sheet for a jet suction dredger and a site that does not match the brochure. The JSD250 numbers look generous until you ask what they assume about depth, discharge distance, and bed material. We walk buyers through the JSD table row by row, because a figure quoted without its test condition leads to a disappointed handover.
We start with the row that matters most to the job and work outward. A jet suction dredger JSD250 from ITECH Co.,Ltd. is a high-pressure jet system that loosens sand before a suction pump carries slurry to a discharge line. Here we read each published figure, show where depth fights discharge distance, and flag the gravel and power limits we confirm in writing.
The JSD250 is a floating dredger built around a high-pressure water jet and a sand suction pump. A jet ring at the suction head loosens the bed; the pump draws the slurry through a discharge pipe. The hull carries the main engine, pump, and anchor gear. You position the unit on cables and let the jet cut. Our jet suction dredger range uses this layout across the series.
The jet pumps water into the sediment, lifting grains into suspension. The suction pump then moves the slurry to the discharge point. Because water does the loosening, the system suits sand under a clay cap and works in great depths, though hard clay still needs time to break down.
Many sand deposits sit under clay. A cutter dredger must chew through that cap first. A jet system works at the interface: water loosens the sediment and the pump extracts the sand beneath it, recovering target material with less disturbance.
The JSD250 pairs a 10/8 inch pump delivering 620 to 1450 m3/hr with a discharge line that carries slurry to a remote bank. There is no barge shuttle or reload step, and a head of 21 to 35 m gives room to plan the pipe run.
Water jet plus suction pump is a short mechanical chain. You avoid the cutter gearbox and teeth a cutter dredger consumes in abrasive ground. Wear concentrates in the pump and nozzles, which are easy to inspect, so maintenance stays predictable.
We treat the published table as a starting point, not a fixed promise. The site note is explicit: data can be adjusted, and actual discharge and capacity depend on the work site. That helps when your pipe run sits near a table limit.
We read the JSD250 data sheet with you one line at a time. Each figure below is published; anything we cannot publish stays to be confirmed in writing.
Published capacity is 130 to 260 m3/hr. The range spans loose sand and denser material, and output changes with the duty cycle. Work back from what you need per shift; do not read the top number as a guaranteed rate.
The pump is listed as 10/8 inch, with flow from 620 to 1450 m3/hr and head from 21 to 35 m. Flow moves the slurry; head pushes it along the pipe and up to the bank. You need both to place material at distance. High flow with too little head stalls in a long line.
Maximum dredging depth is 15 m; maximum discharge distance runs from 200 to 1000 m. These figures pull against each other. Send slurry farther and you lose energy for lifting it from depth. We ask for both numbers before we say a JSD250 fits your pit.
The JSD250 passes gravel up to 60 to 70 mm. That is a passing limit, not a crushing rating, and rounded river gravel behaves differently from sharp quarry stone. If your bed carries cobbles above that range, we will say the configuration is wrong.
Main engine power is 180 to 250 kW. The lower end suits shorter runs and shallower cuts; the upper end supports longer discharge and denser slurry. We size the engine to the whole circuit, not the pump alone, since power beyond what the line needs buys no output.
Every JSD figure can be adjusted to customer requirements, and actual discharge and capacity depend on the site. We put the agreed engine rating, pump size, and expected output in writing. Review the JSD250 specification page before you fix a number.
| JSD Series Specification Comparison |
| Model |
|---|
| Capacity m3/hr |
| Max discharge m |
| Max gravel mm |
| Max depth m |
| Engine power kW |
| JSD200 |
| 80-110 |
| 200-600 |
| 50-60 |
| 15 |
| 132-156 |
| JSD250 |
| 130-260 |
| 200-1000 |
| 60-70 |
| 15 |
| 180-250 |
| JSD300 |
| 300-360 |
| 200-1500 |
| 60-70 |
| 15 |
| 250-300 |
| JSD350 |
| 360-390 |
| 200-1800 |
| 60-70 |
| 20 |
| 300-410 |
| JSD400 |
| 440-520 |
| 200-2000 |
| 60-80 |
| 20 |
| 410-460 |
The JSD250 sits in the middle of the range. A 10/8 inch pump, 180 to 250 kW engine, and 200 to 1000 m discharge make it a common pick for medium sand work. It reaches 15 m and takes 60 to 70 mm gravel. Choose it when both limits cover your job.
When the pipe run passes 1000 m, we look at larger models. The JSD300 reaches 200 to 1500 m with 250 to 300 kW; the JSD400 goes to 2000 m with 410 to 460 kW. Moving up buys distance and capacity at the cost of more fuel and deck space.
Any published figure can be adjusted to your requirements. We build to a spec rather than force a standard hull onto the job. Tell us the depth, pipe length, and gravel size, and we will confirm the build in writing. Custom work takes longer, so plan the order date.
This is the JSD's strongest case. The jet loosens sediment at the clay interface and the pump extracts sand beneath it, so you avoid stripping the overburden first and recovery improves with less mixing.
The JSD works in great depths, which suits river and lake beds where sand sits below a water column. A floating unit positions over the deposit and pumps to shore, but the 15 m limit sets the boundary, so check the bed profile first.
Channels silt up and ports lose depth. A jet suction unit removes fine sand without a cutter head, limiting disturbance near structures, and discharge to a placement area keeps work continuous. Confirm the discharge distance first.
Contractors use sand dredgers to feed reclamation and borrow pit operations. The JSD250's continuous flow suits a steady fill requirement; match pump output to the receiving site's capacity and confirm the solids content in writing.
| Jet Suction vs. Other Dredging Methods |
| Decision Factor |
|---|
| Jet Suction Dredger |
| Cutter Suction Dredger |
| Mechanical Grab |
| Loosening method |
| High-pressure water jet |
| Rotating cutterhead |
| Bucket digs directly |
| Best material |
| Sand beneath clay |
| Compacted soil and rock |
| Mixed debris and scrap |
| Conveyance |
| Slurry through pipeline |
| Slurry through pipeline |
| Barge haul cycle |
| Depth strength |
| Works in great depths |
| Varies by model |
| Limited by rope reach |
| Output pattern |
| Continuous flow |
| Continuous flow |
| Cyclical |
Turn the 130 to 260 m3/hr figure into a shift target, then subtract downtime for anchors and pipe moves. A site with many relocations never reaches the peak, so we quote a realistic average rather than a headline rate.
Depth and discharge distance compete for the same energy. If you need the full 1000 m run, expect to give up some of the 15 m depth. Write down both limits and we will tell you where the JSD250 stops fitting.
Measure the largest fraction in your bed, not the average. The 60 to 70 mm limit assumes material the pump can swallow. Angular stone or a few oversized cobbles change the answer. When in doubt, send a sample and we will review it.
Match the 180 to 250 kW engine to the full pipeline, including bends and elevation. A longer line needs more head and power. Undersizing causes stalls; oversizing wastes fuel. We calculate against your actual route, not a short test line.
Ask which figures are fixed and which are open. The site note allows adjustment, but not every limit moves. We mark the agreed engine, pump, and output figures in writing, so quote and handover match.
The hull carries the jet frame, pump, and engine, so it must float level and hold position against current. Anchor handling matters more than hull size in a flowing river: a unit that drags its anchors cuts an uneven trench.
Fix the discharge pipe and position the jet head on a controlled winch, raising and lowering it without swinging into the hull. Check anchor lines before every shift; most JSD downtime comes from positioning, not the pump.
Confirm the placement area, pipe route, and depth profile before delivery. Published capacity and discharge depend on the site, so we ask for those three inputs early, turning a spec sheet into a workable plan.
List depth, discharge distance, gravel size, and required hourly output on one page. Compare the JSD250 against those four. If two sit at the table limit, ask us to check the combination rather than assume it will work together.
Tell us what you want to change: engine rating, pump size, or discharge layout. We build to the agreed spec and mark the rest to be confirmed in writing. Confirm the build sheet before the deposit, since late changes cost time.
Send a bed sample if gravel content is uncertain. A sample supports an honest statement on output and wear, so we test it rather than revise a quote after delivery.
Ask who commissions the unit and who supplies wear parts. We support start-up and confirm which parts we carry. Clear support terms matter once the dredger is on site and the first pipe run is being planned by your crew.
We have built dredgers since 1994 and publish the JSD figures so buyers can check them before ordering. Our team walks the spec table with you line by line rather than sending one output number. You can read about our facilities on our company background page. Bring your depth, pipe run, and gravel size and we will tell you whether the JSD250 fits.
Published capacity is 130 to 260 m3/hr, but that range depends on material and site. We would rather agree a realistic hourly figure in writing than quote the top and miss it at handover. Send your depth and pipe run.
The JSD250 lists 15 m maximum depth and 200 to 1000 m maximum discharge. They compete because the same pump energy lifts slurry and pushes it down the line. Using the full discharge distance reduces the depth you can hold. Tell us both targets and we will check the combination.
The stated limit is 60 to 70 mm. That is a passing size, not a guarantee for every shape of stone. Rounded gravel passes more easily than angular rock. If your bed carries larger cobbles, this hull is the wrong choice. Send a sample and we will confirm what is realistic.
Main engine power is published as 180 to 250 kW. We size it against the whole circuit: pump, pipe length, bends, and elevation. A longer run needs more head and power. We confirm the final rating in writing so you do not pay for power the line cannot use.
Yes. The site note says any data can be adjusted to customer requirements, and we accept customized dredgers. Engine rating, pump size, and discharge layout can be set to the job. Tell us your depth, distance, and gravel size and we will confirm the build before production.
Jet Suction Dredger JSD250 Specifications and Output Guide for Contractors
The Ultimate Guide To Cutter Suction Hopper Dredger Manufacturers
Power Jet Suction Dredge: The Complete 2024 Guide to Technology, Applications & Suppliers
Jet Suction Dredger for Reclamation Fast and Economical Solution
Jet Suction Dredger Efficient Solution for Sand And Slurry Extraction